Solar installation in Morocco — Prices & Free Quote

30 000 – 80 000 MADEstimated duration : 2-4 days

Produce your own electricity with Morocco's sun (3,000h sunshine/year). Photovoltaic panels, hybrid inverter and ONEE grid connection. ROI in 4-6 years.

A 3 kWp kit (6-8 panels) for a house costs 30,000-50,000 MAD. A 5 kWp kit for a villa: 50,000-80,000 MAD.

Photo gallery

Solar installation — photo 1 — lechantier.ma
Solar installation — photo 2 — lechantier.ma
Solar installation — photo 3 — lechantier.ma
Solar installation — photo 4 — lechantier.ma

What's included

Tier 1 solar panels (JA Solar, LONGi, Trina)
Hybrid inverter (Growatt, Huawei)
Roof or ground mounting structure
DC/AC protection box
Lithium battery (optional)
Wiring and panel connection
Commissioning and setup
ONEE file (grid injection)

Choose your plan

Economy

30 000 MAD

  • 3 kWp kit (6x 550W panels)
  • Growatt string inverter
  • Pitched roof mounting
  • Without battery
Select this plan

Standard

55 000 MAD

  • 5 kWp kit (10x 550W panels)
  • Huawei hybrid inverter
  • Real-time WiFi monitoring
  • ONEE net metering file
  • 25-year panel warranty
Select this plan
Recommended

Premium

80 000 MAD

  • 8 kWp kit (15x 550W panels)
  • Hybrid inverter + 10 kWh battery
  • Backup during power outages
  • Per-panel optimizers
  • App + screen monitoring
  • Installation + full ONEE file
Select this plan

How it works?

1

Energy study

Analysis of your consumption, roof orientation and optimal sizing.

2

Quote & subsidies

Technical and financial proposal with available subsidies and ROI.

3

Installation

Panel, inverter, wiring and connection installation. 2-4 days.

4

Commissioning

Tests, inverter setup, monitoring app and training.

Frequently asked questions

How much does solar installation cost in Morocco?

3 kWp: 30,000-50,000 MAD. 5 kWp: 50,000-80,000 MAD. With batteries: +20,000-40,000 MAD.

What's the ROI?

4-6 years in Morocco thanks to 3,000h sun/year. Then near-free electricity for 20+ years.

Can I sell to ONEE?

Yes, net metering allowed. You pay the difference between production and consumption.

Are batteries needed?

Not mandatory if grid-connected. Useful for frequent outages.

Which panel brands?

JA Solar, LONGi, Trina Solar (Tier 1, 25-year warranty). Inverters: Growatt, Huawei.